US Bridges

S-39-40 over Brushy Creek

Fair

Pickens County, South Carolina · 4.0 MI S Easley · Structure no. 000000000006765

Built
1975
50 years old
Condition
Fair
inspected November 2024
Type
Channel Beam
Prestressed Concrete
Length
120 ft
4 main spans
Daily traffic
6,700
2023 count
Owner
State
State Highway Agency

About this bridge

S-39-40 over Brushy Creek is a prestressed concrete channel beam carrying S-39-40 over Brushy Creek in Pickens County, South Carolina. It was built in 1975, so it is 50 years old, older than the South Carolina average of 48 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 6,700 vehicles a day, roughly 2% of them trucks, projected to reach 10,251 by 2043. The structure is 120 ft (36.6 m) long and 33 ft wide.

CarriesS-39-40
CrossesBrushy Creek
Location4.0 MI S Easley
RouteState Highway 40
Coordinates34.78745, -82.56718
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.6 US tons
Inventory rating28.5 US tons

Structure

Structure typeChannel Beam
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans4
Design loadH 15
Structure length120 ft (36.6 m)
Longest span30 ft (9.1 m)
Deck width33 ft (10.2 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,700 (2023)
Projected traffic10,251 by 2043
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was S-39-40 over Brushy Creek built?

It was built in 1975, making it 50 years old in 2025.

What condition is S-39-40 over Brushy Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does S-39-40 over Brushy Creek carry?

About 6,700 vehicles per day (2023 count), of which roughly 2% are trucks.

How long is S-39-40 over Brushy Creek?

The structure is 120 ft (36.6 m) long with a longest span of 30 ft (9.1 m) and a deck 33 ft wide.

Who owns S-39-40 over Brushy Creek?

It is owned by the State Highway Agency.