Sc 11 over Gville Water Works Pipes
PoorPickens County, South Carolina · 14MI NE of Pickens · Structure no. 000000000005838
- Built
- 1970
- 55 years old
- Condition
- Poor
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 180 ft
- 4 main spans
- Daily traffic
- 3,300
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Sc 11 over Gville Water Works Pipes is a prestressed concrete stringer/multi-beam or girder carrying Sc 11 over Gville Water Works Pipes in Pickens County, South Carolina. It was built in 1970, so it is 55 years old, older than the South Carolina average of 48 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 3,300 vehicles a day, roughly 16% of them trucks, projected to reach 5,247 by 2043. The structure is 180 ft (54.9 m) long and 48 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sc 11 over Gville Water Works Pipes built?
It was built in 1970, making it 55 years old in 2025.
What condition is Sc 11 over Gville Water Works Pipes in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in June 2024.
How much traffic does Sc 11 over Gville Water Works Pipes carry?
About 3,300 vehicles per day (2023 count), of which roughly 16% are trucks.
How long is Sc 11 over Gville Water Works Pipes?
The structure is 180 ft (54.9 m) long with a longest span of 50 ft (15.2 m) and a deck 48 ft wide.
Who owns Sc 11 over Gville Water Works Pipes?
It is owned by the State Highway Agency.