US Bridges

S-39-25 over Trib to Oolenoy River

Good

Pickens County, South Carolina · 9.0 MI N Pickens · Structure no. 000000000002237

Built
2015
10 years old
Condition
Good
inspected October 2024
Type
Slab
Prestressed Concrete
Length
60 ft
1 main span
Daily traffic
125
2023 count
Owner
State
State Highway Agency

About this bridge

S-39-25 over Trib to Oolenoy River is a prestressed concrete slab carrying S-39-25 over Trib to Oolenoy River in Pickens County, South Carolina. It was built in 2015, so it is 10 years old, younger than the South Carolina average of 48 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 125 vehicles a day, roughly 5% of them trucks, projected to reach 160 by 2043. The structure is 60 ft (18.3 m) long and 36 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesS-39-25
CrossesTrib to Oolenoy River
Location9.0 MI N Pickens
RouteState Highway 25
Coordinates35.00842, -82.67911
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating59.6 US tons
Inventory rating46.1 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHL 93
Structure length60 ft (18.3 m)
Longest span60 ft (18.3 m)
Deck width36 ft (10.9 m)
Roadway width33 ft (10.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic125 (2023)
Projected traffic160 by 2043
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was S-39-25 over Trib to Oolenoy River built?

It was built in 2015, making it 10 years old in 2025.

What condition is S-39-25 over Trib to Oolenoy River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does S-39-25 over Trib to Oolenoy River carry?

About 125 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is S-39-25 over Trib to Oolenoy River?

The structure is 60 ft (18.3 m) long with a longest span of 60 ft (18.3 m) and a deck 36 ft wide.

Who owns S-39-25 over Trib to Oolenoy River?

It is owned by the State Highway Agency.