US Bridges

S-37-90 over Trib to Rocky Fork CR

Fair

Oconee County, South Carolina · 8 MI NW Westminster · Structure no. 000000000004861

Built
1966
59 years old
Condition
Fair
inspected February 2025
Type
Slab
Concrete
Length
45 ft
3 main spans
Daily traffic
275
2023 count
Owner
State
State Highway Agency

About this bridge

S-37-90 over Trib to Rocky Fork CR is a concrete slab carrying S-37-90 over Trib to Rocky Fork CR in Oconee County, South Carolina. It was built in 1966, so it is 59 years old, older than the South Carolina average of 48 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 275 vehicles a day, roughly 5% of them trucks, projected to reach 352 by 2043. The structure is 45 ft (13.7 m) long and 28 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesS-37-90
CrossesTrib to Rocky Fork CR
Location8 MI NW Westminster
RouteState Highway 90
Coordinates34.72254, -83.2147
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection7 GoodSome minor problems.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating29.7 US tons
Inventory rating17.9 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, precast panels
Main spans3
Design loadH 10
Structure length45 ft (13.7 m)
Longest span15 ft (4.6 m)
Deck width28 ft (8.4 m)
Roadway width26 ft (8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic275 (2023)
Projected traffic352 by 2043
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was S-37-90 over Trib to Rocky Fork CR built?

It was built in 1966, making it 59 years old in 2025.

What condition is S-37-90 over Trib to Rocky Fork CR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.

How much traffic does S-37-90 over Trib to Rocky Fork CR carry?

About 275 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is S-37-90 over Trib to Rocky Fork CR?

The structure is 45 ft (13.7 m) long with a longest span of 15 ft (4.6 m) and a deck 28 ft wide.

Who owns S-37-90 over Trib to Rocky Fork CR?

It is owned by the State Highway Agency.