S-33-23 over Hard Labor Creek
FairMcCormick County, South Carolina · 4.7 NE Mccormick · Structure no. 000000000005811
- Built
- 1970
- 55 years old
- Condition
- Fair
- inspected June 2023
- Type
- Slab
- Concrete
- Length
- 135 ft
- 9 main spans
- Daily traffic
- 150
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
S-33-23 over Hard Labor Creek is a concrete slab carrying S-33-23 over Hard Labor Creek in McCormick County, South Carolina. It was built in 1970, so it is 55 years old, older than the South Carolina average of 48 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 150 vehicles a day, roughly 8% of them trucks, projected to reach 219 by 2043. The structure is 135 ft (41.1 m) long and 27 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S-33-23 over Hard Labor Creek built?
It was built in 1970, making it 55 years old in 2025.
What condition is S-33-23 over Hard Labor Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does S-33-23 over Hard Labor Creek carry?
About 150 vehicles per day (2023 count), of which roughly 8% are trucks.
How long is S-33-23 over Hard Labor Creek?
The structure is 135 ft (41.1 m) long with a longest span of 15 ft (4.6 m) and a deck 27 ft wide.
Who owns S-33-23 over Hard Labor Creek?
It is owned by the State Highway Agency.