US Bridges

S-32-365 over I-26

Good

Lexington County, South Carolina · Town of Springdale · Structure no. 000000000003035

Built
2018
7 years old
Condition
Good
inspected December 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
258 ft
2 main spans
Daily traffic
3,500
2023 count
Owner
State
State Highway Agency

About this bridge

S-32-365 over I-26 is a prestressed concrete continuous stringer/multi-beam or girder carrying S-32-365 over I-26 in Lexington County, South Carolina. It was built in 2018, so it is 7 years old, younger than the South Carolina average of 48 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,500 vehicles a day, roughly 3% of them trucks, projected to reach 4,620 by 2043. The structure is 258 ft (78.6 m) long and 43 ft wide.

CarriesS-32-365
CrossesI-26
LocationTown of Springdale
RouteState Highway 365
Coordinates33.97045, -81.10145
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating33.6 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length258 ft (78.6 m)
Longest span129 ft (39.3 m)
Deck width43 ft (13.2 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,500 (2023)
Projected traffic4,620 by 2043
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was S-32-365 over I-26 built?

It was built in 2018, making it 7 years old in 2025.

What condition is S-32-365 over I-26 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does S-32-365 over I-26 carry?

About 3,500 vehicles per day (2023 count), of which roughly 3% are trucks.

How long is S-32-365 over I-26?

The structure is 258 ft (78.6 m) long with a longest span of 129 ft (39.3 m) and a deck 43 ft wide.

Who owns S-32-365 over I-26?

It is owned by the State Highway Agency.