US Bridges

S-26-926 over Trib to Icww

Good

Horry County, South Carolina · 1 MI W Socastee · Structure no. 000000000006701

Built
2011
14 years old
Condition
Good
inspected July 2023
Type
Slab
Concrete
Length
180 ft
5 main spans
Daily traffic
700
2023 count
Owner
State
State Highway Agency

About this bridge

S-26-926 over Trib to Icww is a concrete slab carrying S-26-926 over Trib to Icww in Horry County, South Carolina. It was built in 2011, so it is 14 years old, younger than the South Carolina average of 48 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 700 vehicles a day, roughly 6% of them trucks, projected to reach 637 by 2043. The structure is 180 ft (54.9 m) long and 38 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesS-26-926
CrossesTrib to Icww
Location1 MI W Socastee
RouteState Highway 926
Coordinates33.67573, -79.01392
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51 US tons
Inventory rating39.2 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, precast panels
Main spans5
Design loadHL 93
Structure length180 ft (54.9 m)
Longest span40 ft (12.2 m)
Deck width38 ft (11.6 m)
Roadway width25 ft (7.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic700 (2023)
Projected traffic637 by 2043
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was S-26-926 over Trib to Icww built?

It was built in 2011, making it 14 years old in 2025.

What condition is S-26-926 over Trib to Icww in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does S-26-926 over Trib to Icww carry?

About 700 vehicles per day (2023 count), of which roughly 6% are trucks.

How long is S-26-926 over Trib to Icww?

The structure is 180 ft (54.9 m) long with a longest span of 40 ft (12.2 m) and a deck 38 ft wide.

Who owns S-26-926 over Trib to Icww?

It is owned by the State Highway Agency.