US Bridges

S-24-424 over Wilson Creek

Good

Greenwood County, South Carolina · 4.1MI NE Greenwood · Structure no. 000000000005088

Built
2006
19 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
120 ft
1 main span
Daily traffic
2,300
2023 count
Owner
State
State Highway Agency

About this bridge

S-24-424 over Wilson Creek is a prestressed concrete stringer/multi-beam or girder carrying S-24-424 over Wilson Creek in Greenwood County, South Carolina. It was built in 2006, so it is 19 years old, younger than the South Carolina average of 48 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,300 vehicles a day, roughly 4% of them trucks, projected to reach 3,243 by 2043. The structure is 120 ft (36.6 m) long and 37 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesS-24-424
CrossesWilson Creek
Location4.1MI NE Greenwood
RouteState Highway 424
Coordinates34.20786, -82.09267
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating52.5 US tons
Inventory rating36.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadHS 20
Structure length120 ft (36.6 m)
Longest span60 ft (18.3 m)
Deck width37 ft (11.3 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,300 (2023)
Projected traffic3,243 by 2043
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was S-24-424 over Wilson Creek built?

It was built in 2006, making it 19 years old in 2025.

What condition is S-24-424 over Wilson Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does S-24-424 over Wilson Creek carry?

About 2,300 vehicles per day (2023 count), of which roughly 4% are trucks.

How long is S-24-424 over Wilson Creek?

The structure is 120 ft (36.6 m) long with a longest span of 60 ft (18.3 m) and a deck 37 ft wide.

Who owns S-24-424 over Wilson Creek?

It is owned by the State Highway Agency.