US Bridges

C-23-2712 over Enoree River

Good

Greenville County, South Carolina · 4 MI S of Greer · Structure no. 000000000010311

Built
2019
6 years old
Condition
Good
inspected July 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
95 ft
1 main span
Daily traffic
150
2023 count
Owner
County
County Highway Agency

About this bridge

C-23-2712 over Enoree River is a prestressed concrete box beam or girders - multiple carrying C-23-2712 over Enoree River in Greenville County, South Carolina. It was built in 2019, so it is 6 years old, younger than the South Carolina average of 48 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 150 vehicles a day, roughly 5% of them trucks, projected to reach 192 by 2043. The structure is 95 ft (29 m) long and 40 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesC-23-2712
CrossesEnoree River
Location4 MI S of Greer
RouteCounty Highway 2712
Coordinates34.88486, -82.25306
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating85 US tons
Inventory rating65.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length95 ft (29 m)
Longest span95 ft (29 m)
Deck width40 ft (12.3 m)
Roadway width37 ft (11.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic150 (2023)
Projected traffic192 by 2043
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was C-23-2712 over Enoree River built?

It was built in 2019, making it 6 years old in 2025.

What condition is C-23-2712 over Enoree River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does C-23-2712 over Enoree River carry?

About 150 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is C-23-2712 over Enoree River?

The structure is 95 ft (29 m) long with a longest span of 95 ft (29 m) and a deck 40 ft wide.

Who owns C-23-2712 over Enoree River?

It is owned by the County Highway Agency.