L-23-1162 over Trib to Saluda River
GoodGreenville County, South Carolina · 7.4 MI SW of Greenville · Structure no. 000000000010308
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected July 2024
- Type
- Slab
- Prestressed Concrete
- Length
- 45 ft
- 1 main span
- Daily traffic
- 500
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
L-23-1162 over Trib to Saluda River is a prestressed concrete slab carrying L-23-1162 over Trib to Saluda River in Greenville County, South Carolina. It was built in 2018, so it is 7 years old, younger than the South Carolina average of 48 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 500 vehicles a day, roughly 5% of them trucks, projected to reach 640 by 2043. The structure is 45 ft (13.7 m) long and 41 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was L-23-1162 over Trib to Saluda River built?
It was built in 2018, making it 7 years old in 2025.
What condition is L-23-1162 over Trib to Saluda River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does L-23-1162 over Trib to Saluda River carry?
About 500 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is L-23-1162 over Trib to Saluda River?
The structure is 45 ft (13.7 m) long with a longest span of 45 ft (13.7 m) and a deck 41 ft wide.
Who owns L-23-1162 over Trib to Saluda River?
It is owned by the County Highway Agency.