US Bridges

Sc 153 over Saluda River

Good

Greenville County, South Carolina · South of Greenville · Structure no. 000000000009639

Built
1999
26 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
430 ft
4 main spans
Daily traffic
11,800
2023 count
Owner
State
State Highway Agency

About this bridge

Sc 153 over Saluda River is a steel continuous stringer/multi-beam or girder carrying Sc 153 over Saluda River in Greenville County, South Carolina. It was built in 1999, so it is 26 years old, younger than the South Carolina average of 48 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,800 vehicles a day, roughly 11% of them trucks, projected to reach 14,986 by 2043. The structure is 430 ft (131.1 m) long and 47 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesSc 153
CrossesSaluda River
LocationSouth of Greenville
RouteState Highway 153
Coordinates34.76463, -82.45457
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating52.1 US tons
Inventory rating40 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 25 or greater
Structure length430 ft (131.1 m)
Longest span125 ft (38.1 m)
Deck width47 ft (14.4 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,800 (2023)
Projected traffic14,986 by 2043
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Sc 153 over Saluda River built?

It was built in 1999, making it 26 years old in 2025.

What condition is Sc 153 over Saluda River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Sc 153 over Saluda River carry?

About 11,800 vehicles per day (2023 count), of which roughly 11% are trucks.

How long is Sc 153 over Saluda River?

The structure is 430 ft (131.1 m) long with a longest span of 125 ft (38.1 m) and a deck 47 ft wide.

Who owns Sc 153 over Saluda River?

It is owned by the State Highway Agency.