US Bridges

S-23-969 over North Saluda River

Poor

Greenville County, South Carolina · 10.6 MI N Travelers Rest · Structure no. 000000000000292

Built
1928
97 years old
Condition
Poor
inspected April 2024
Type
Tee Beam
Concrete
Length
125 ft
5 main spans
Daily traffic
225
2023 count
Owner
State
State Highway Agency

About this bridge

S-23-969 over North Saluda River is a concrete tee beam carrying S-23-969 over North Saluda River in Greenville County, South Carolina. It was built in 1928, so it is 97 years old, older than the South Carolina average of 48 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

It carries about 225 vehicles a day, roughly 7% of them trucks, projected to reach 313 by 2043. The structure is 125 ft (38.1 m) long and 24 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesS-23-969
CrossesNorth Saluda River
Location10.6 MI N Travelers Rest
RouteState Highway 969
Coordinates35.11612, -82.4455
Functional classRural Minor Collector

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure4 PoorAdvanced section loss, deterioration, spalling or scour.
Substructure4 PoorAdvanced section loss, deterioration, spalling or scour.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47.5 US tons
Inventory rating28.2 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans5
Design loadH 15
Structure length125 ft (38.1 m)
Longest span25 ft (7.6 m)
Deck width24 ft (7.2 m)
Roadway width20 ft (6.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic225 (2023)
Projected traffic313 by 2043
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$621,000 (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was S-23-969 over North Saluda River built?

It was built in 1928, making it 97 years old in 2025.

What condition is S-23-969 over North Saluda River in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in April 2024.

How much traffic does S-23-969 over North Saluda River carry?

About 225 vehicles per day (2023 count), of which roughly 7% are trucks.

How long is S-23-969 over North Saluda River?

The structure is 125 ft (38.1 m) long with a longest span of 25 ft (7.6 m) and a deck 24 ft wide.

Who owns S-23-969 over North Saluda River?

It is owned by the State Highway Agency.