US Bridges

S-21-107 over I-95

Good

Florence County, South Carolina · 4 MI SW of Florence · Structure no. 000000000010347

Built
2023
2 years old
Condition
Good
inspected January 2025
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
284 ft
4 main spans
Daily traffic
2,700
2023 count
Owner
State
State Highway Agency

About this bridge

S-21-107 over I-95 is a prestressed concrete continuous stringer/multi-beam or girder carrying S-21-107 over I-95 in Florence County, South Carolina. It was built in 2023, so it is 2 years old, younger than the South Carolina average of 48 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,700 vehicles a day, roughly 7% of them trucks, projected to reach 3,429 by 2043. The structure is 284 ft (86.6 m) long and 62 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesS-21-107
CrossesI-95
Location4 MI SW of Florence
RouteState Highway 107
Coordinates34.14663, -79.87616
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating56.4 US tons
Inventory rating43.5 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length284 ft (86.6 m)
Longest span102 ft (31.1 m)
Deck width62 ft (19 m)
Roadway width59 ft (18 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,700 (2023)
Projected traffic3,429 by 2043
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was S-21-107 over I-95 built?

It was built in 2023, making it 2 years old in 2025.

What condition is S-21-107 over I-95 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does S-21-107 over I-95 carry?

About 2,700 vehicles per day (2023 count), of which roughly 7% are trucks.

How long is S-21-107 over I-95?

The structure is 284 ft (86.6 m) long with a longest span of 102 ft (31.1 m) and a deck 62 ft wide.

Who owns S-21-107 over I-95?

It is owned by the State Highway Agency.