US Bridges

S-21-278 over Ditch to Two Mili Br

Good

Florence County, South Carolina · 3.5 MI NW Scranton · Structure no. 000000000008844

Built
1995
30 years old
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
30 ft
1 main span
Daily traffic
750
2023 count
Owner
State
State Highway Agency

About this bridge

S-21-278 over Ditch to Two Mili Br is a prestressed concrete stringer/multi-beam or girder carrying S-21-278 over Ditch to Two Mili Br in Florence County, South Carolina. It was built in 1995, so it is 30 years old, younger than the South Carolina average of 48 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 750 vehicles a day, roughly 9% of them trucks, projected to reach 1,095 by 2043. The structure is 30 ft (9.1 m) long and 39 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesS-21-278
CrossesDitch to Two Mili Br
Location3.5 MI NW Scranton
RouteState Highway 278
Coordinates33.94861, -79.7925
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating96.1 US tons
Inventory rating51.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length30 ft (9.1 m)
Longest span30 ft (9.1 m)
Deck width39 ft (11.9 m)
Roadway width34 ft (10.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic750 (2023)
Projected traffic1,095 by 2043
Trucks9%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was S-21-278 over Ditch to Two Mili Br built?

It was built in 1995, making it 30 years old in 2025.

What condition is S-21-278 over Ditch to Two Mili Br in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does S-21-278 over Ditch to Two Mili Br carry?

About 750 vehicles per day (2023 count), of which roughly 9% are trucks.

How long is S-21-278 over Ditch to Two Mili Br?

The structure is 30 ft (9.1 m) long with a longest span of 30 ft (9.1 m) and a deck 39 ft wide.

Who owns S-21-278 over Ditch to Two Mili Br?

It is owned by the State Highway Agency.