S-163/SUMMERS DR over Trib to Fishburne Creek
GoodDorchester County, South Carolina · 8.5 MI SW Summerville · Structure no. 000000000009000
- Built
- 2016
- 9 years old
- Condition
- Good
- inspected April 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 44 ft
- 1 main span
- Daily traffic
- 750
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
S-163/SUMMERS DR over Trib to Fishburne Creek is a prestressed concrete box beam or girders - multiple carrying S-163/SUMMERS DR over Trib to Fishburne Creek in Dorchester County, South Carolina. It was built in 2016, so it is 9 years old, younger than the South Carolina average of 48 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 750 vehicles a day, roughly 5% of them trucks, projected to reach 960 by 2043. The structure is 44 ft (13.4 m) long and 54 ft wide. If it were closed, the detour would be 14.9 mi (24 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S-163/SUMMERS DR over Trib to Fishburne Creek built?
It was built in 2016, making it 9 years old in 2025.
What condition is S-163/SUMMERS DR over Trib to Fishburne Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does S-163/SUMMERS DR over Trib to Fishburne Creek carry?
About 750 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is S-163/SUMMERS DR over Trib to Fishburne Creek?
The structure is 44 ft (13.4 m) long with a longest span of 44 ft (13.4 m) and a deck 54 ft wide.
Who owns S-163/SUMMERS DR over Trib to Fishburne Creek?
It is owned by the State Highway Agency.