US Bridges

S-12-30 over Rock Branch

Good

Chester County, South Carolina · 5MI SW Chester · Structure no. 000000000007661

Built
1983
42 years old
Condition
Good
inspected January 2025
Type
Culvert
Concrete
Length
22 ft
2 main spans
Daily traffic
350
2023 count
Owner
State
State Highway Agency

About this bridge

S-12-30 over Rock Branch is a concrete culvert carrying S-12-30 over Rock Branch in Chester County, South Carolina. It was built in 1983, so it is 42 years old, younger than the South Carolina average of 48 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 350 vehicles a day, roughly 4% of them trucks, projected to reach 487 by 2025. The structure is 22 ft (6.7 m) long and 75 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesS-12-30
CrossesRock Branch
Location5MI SW Chester
RouteState Highway 30
Coordinates34.71806, -81.30194
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert8 Very GoodNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating97.6 US tons
Inventory rating75 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadH 20
Structure length22 ft (6.7 m)
Longest span11 ft (3.4 m)
Deck width75 ft (22.9 m)
Roadway width33 ft (10.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic350 (2023)
Projected traffic487 by 2025
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was S-12-30 over Rock Branch built?

It was built in 1983, making it 42 years old in 2025.

What condition is S-12-30 over Rock Branch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does S-12-30 over Rock Branch carry?

About 350 vehicles per day (2023 count), of which roughly 4% are trucks.

How long is S-12-30 over Rock Branch?

The structure is 22 ft (6.7 m) long with a longest span of 11 ft (3.4 m) and a deck 75 ft wide.

Who owns S-12-30 over Rock Branch?

It is owned by the State Highway Agency.