US Bridges

S-11-97 over Goforth Creek

Good

Cherokee County, South Carolina · 6 MI N of Gaffney · Structure no. 000000000010760

Built
2023
2 years old
Condition
Good
inspected May 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
130 ft
1 main span
Daily traffic
125
2023 count
Owner
State
State Highway Agency

About this bridge

S-11-97 over Goforth Creek is a prestressed concrete box beam or girders - multiple carrying S-11-97 over Goforth Creek in Cherokee County, South Carolina. It was built in 2023, so it is 2 years old, younger than the South Carolina average of 48 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 125 vehicles a day, roughly 5% of them trucks, projected to reach 160 by 2043. The structure is 130 ft (39.6 m) long and 30 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesS-11-97
CrossesGoforth Creek
Location6 MI N of Gaffney
RouteState Highway 97
Coordinates35.15811, -81.66361
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.6 US tons
Inventory rating48.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1 (+1 approach)
Design loadHL 93
Structure length130 ft (39.6 m)
Longest span100 ft (30.5 m)
Deck width30 ft (9.1 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic125 (2023)
Projected traffic160 by 2043
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was S-11-97 over Goforth Creek built?

It was built in 2023, making it 2 years old in 2025.

What condition is S-11-97 over Goforth Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does S-11-97 over Goforth Creek carry?

About 125 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is S-11-97 over Goforth Creek?

The structure is 130 ft (39.6 m) long with a longest span of 100 ft (30.5 m) and a deck 30 ft wide.

Who owns S-11-97 over Goforth Creek?

It is owned by the State Highway Agency.