Sc 329 over Southern Railway
FairCherokee County, South Carolina · 4.3 Mi. NE Gaffney · Structure no. 000000000007335
- Built
- 1980
- 45 years old
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 180 ft
- 3 main spans
- Daily traffic
- 4,600
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Sc 329 over Southern Railway is a prestressed concrete stringer/multi-beam or girder carrying Sc 329 over Southern Railway in Cherokee County, South Carolina. It was built in 1980, so it is 45 years old, younger than the South Carolina average of 48 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,600 vehicles a day, roughly 10% of them trucks, projected to reach 6,486 by 2043. The structure is 180 ft (54.9 m) long and 47 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sc 329 over Southern Railway built?
It was built in 1980, making it 45 years old in 2025.
What condition is Sc 329 over Southern Railway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Sc 329 over Southern Railway carry?
About 4,600 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is Sc 329 over Southern Railway?
The structure is 180 ft (54.9 m) long with a longest span of 60 ft (18.3 m) and a deck 47 ft wide.
Who owns Sc 329 over Southern Railway?
It is owned by the State Highway Agency.