R-5447 Pro over Vegetative Right of Way
GoodCharleston County, South Carolina · 1 MI SE North Charleston · Structure no. 000000000010609
- Built
- 2020
- 5 years old
- Condition
- Good
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 400 ft
- 4 main spans
- Daily traffic
- 1,850
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
R-5447 Pro over Vegetative Right of Way is a prestressed concrete continuous stringer/multi-beam or girder carrying R-5447 Pro over Vegetative Right of Way in Charleston County, South Carolina. It was built in 2020, so it is 5 years old, younger than the South Carolina average of 48 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,850 vehicles a day, roughly 45% of them trucks, projected to reach 2,646 by 2043. The structure is 400 ft (121.9 m) long and 35 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was R-5447 Pro over Vegetative Right of Way built?
It was built in 2020, making it 5 years old in 2025.
What condition is R-5447 Pro over Vegetative Right of Way in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.
How much traffic does R-5447 Pro over Vegetative Right of Way carry?
About 1,850 vehicles per day (2023 count), of which roughly 45% are trucks.
How long is R-5447 Pro over Vegetative Right of Way?
The structure is 400 ft (121.9 m) long with a longest span of 100 ft (30.5 m) and a deck 35 ft wide.
Who owns R-5447 Pro over Vegetative Right of Way?
It is owned by the State Highway Agency.