Ramp on Sc 30 WB over Vegetative Right of Way
FairCharleston County, South Carolina · City of Charleston · Structure no. 000000000008620
- Built
- 1993
- 32 years old
- Condition
- Fair
- inspected July 2024
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 530 ft
- 2 main spans
- Daily traffic
- 4,200
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Ramp on Sc 30 WB over Vegetative Right of Way is a prestressed concrete continuous box beam or girders - single or spread carrying Ramp on Sc 30 WB over Vegetative Right of Way in Charleston County, South Carolina. It was built in 1993, so it is 32 years old, younger than the South Carolina average of 48 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,200 vehicles a day, projected to reach 6,804 by 2043. The structure is 530 ft (161.5 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ramp on Sc 30 WB over Vegetative Right of Way built?
It was built in 1993, making it 32 years old in 2025.
What condition is Ramp on Sc 30 WB over Vegetative Right of Way in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Ramp on Sc 30 WB over Vegetative Right of Way carry?
About 4,200 vehicles per day (2023 count).
How long is Ramp on Sc 30 WB over Vegetative Right of Way?
The structure is 530 ft (161.5 m) long with a longest span of 64 ft (19.5 m) and a deck 30 ft wide.
Who owns Ramp on Sc 30 WB over Vegetative Right of Way?
It is owned by the State Highway Agency.