US Bridges

I-526 WB over Airport ACCESS__C-4486

Fair

Charleston County, South Carolina · In N Charleston · Structure no. 000000000007978

Built
1986
39 years old
Condition
Fair
inspected December 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
228 ft
4 main spans
Daily traffic
45,150
2023 count
Owner
State
State Highway Agency

About this bridge

I-526 WB over Airport ACCESS__C-4486 is a steel continuous stringer/multi-beam or girder carrying I-526 WB over Airport ACCESS__C-4486 in Charleston County, South Carolina. It was built in 1986, so it is 39 years old, younger than the South Carolina average of 48 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 45,150 vehicles a day, roughly 6% of them trucks, projected to reach 69,531 by 2043. The structure is 228 ft (69.5 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-526 WB
CrossesAirport ACCESS__C-4486
LocationIn N Charleston
RouteInterstate 526
Coordinates32.86888, -80.02739
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating33.2 US tons
Inventory rating25.7 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length228 ft (69.5 m)
Longest span74 ft (22.6 m)
Deck width43 ft (13 m)
Roadway width39 ft (12 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic45,150 (2023)
Projected traffic69,531 by 2043
Trucks6%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$708,000 (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-526 WB over Airport ACCESS__C-4486 built?

It was built in 1986, making it 39 years old in 2025.

What condition is I-526 WB over Airport ACCESS__C-4486 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.

How much traffic does I-526 WB over Airport ACCESS__C-4486 carry?

About 45,150 vehicles per day (2023 count), of which roughly 6% are trucks.

How long is I-526 WB over Airport ACCESS__C-4486?

The structure is 228 ft (69.5 m) long with a longest span of 74 ft (22.6 m) and a deck 43 ft wide.

Who owns I-526 WB over Airport ACCESS__C-4486?

It is owned by the State Highway Agency.