US Bridges

S-2-25 over Mctier Creek

Good

Aiken County, South Carolina · 5 MI S of Monetta · Structure no. 000000000010172

Built
2019
6 years old
Condition
Good
inspected January 2025
Type
Slab
Prestressed Concrete
Length
70 ft
1 main span
Daily traffic
200
2023 count
Owner
State
State Highway Agency

About this bridge

S-2-25 over Mctier Creek is a prestressed concrete slab carrying S-2-25 over Mctier Creek in Aiken County, South Carolina. It was built in 2019, so it is 6 years old, younger than the South Carolina average of 48 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 200 vehicles a day, roughly 7% of them trucks, projected to reach 292 by 2043. The structure is 70 ft (21.3 m) long and 36 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesS-2-25
CrossesMctier Creek
Location5 MI S of Monetta
RouteState Highway 25
Coordinates33.78124, -81.61264
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating72.9 US tons
Inventory rating56.1 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHL 93
Structure length70 ft (21.3 m)
Longest span70 ft (21.3 m)
Deck width36 ft (11 m)
Roadway width33 ft (10.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2023)
Projected traffic292 by 2043
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was S-2-25 over Mctier Creek built?

It was built in 2019, making it 6 years old in 2025.

What condition is S-2-25 over Mctier Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does S-2-25 over Mctier Creek carry?

About 200 vehicles per day (2023 count), of which roughly 7% are trucks.

How long is S-2-25 over Mctier Creek?

The structure is 70 ft (21.3 m) long with a longest span of 70 ft (21.3 m) and a deck 36 ft wide.

Who owns S-2-25 over Mctier Creek?

It is owned by the State Highway Agency.