Church ST over P&w RR
PoorPosted for loadProvidence County, Rhode Island · 0.1 MI E of JCT Ri 114 · Structure no. 000000000009430
- Built
- 1882
- 143 years old, rebuilt 1995
- Condition
- Poor
- inspected July 2024
- Type
- Truss - Thru
- Steel
- Length
- 109 ft
- 1 main span
- Daily traffic
- 1,111
- 2015 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Church ST over P&w RR is a steel truss - thru carrying Church ST over P&w RR in Providence County, Rhode Island. It was built in 1882 and reconstructed in 1995, so it is 143 years old, older than the Rhode Island average of 54.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.
It carries about 1,111 vehicles a day, roughly 10% of them trucks, projected to reach 1,334 by 2036. The structure is 109 ft (33.1 m) long and 35 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Church ST over P&w RR built?
It was built in 1882, making it 143 years old in 2025. It was reconstructed in 1995.
What condition is Church ST over P&w RR in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in July 2024.
How much traffic does Church ST over P&w RR carry?
About 1,111 vehicles per day (2015 count), of which roughly 10% are trucks.
How long is Church ST over P&w RR?
The structure is 109 ft (33.1 m) long with a longest span of 107 ft (32.6 m) and a deck 35 ft wide.
Who owns Church ST over P&w RR?
It is owned by the Town or Township Highway Agency.