I-95 NB & SB over Public ST
FairProvidence County, Rhode Island · 0.5 MI S of JCT I-195 · Structure no. 000000000006510
- Built
- 1958
- 67 years old, rebuilt 1982
- Condition
- Fair
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 66 ft
- 1 main span
- Daily traffic
- 153,626
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
I-95 NB & SB over Public ST is a prestressed concrete stringer/multi-beam or girder carrying I-95 NB & SB over Public ST in Providence County, Rhode Island. It was built in 1958 and reconstructed in 1982, so it is 67 years old, older than the Rhode Island average of 54.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 153,626 vehicles a day, roughly 15% of them trucks, projected to reach 168,989 by 2041. The structure is 66 ft (20 m) long and 142 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-95 NB & SB over Public ST built?
It was built in 1958, making it 67 years old in 2025. It was reconstructed in 1982.
What condition is I-95 NB & SB over Public ST in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does I-95 NB & SB over Public ST carry?
About 153,626 vehicles per day (2021 count), of which roughly 15% are trucks.
How long is I-95 NB & SB over Public ST?
The structure is 66 ft (20 m) long with a longest span of 60 ft (18.2 m) and a deck 142 ft wide.
Who owns I-95 NB & SB over Public ST?
It is owned by the State Highway Agency.