Central Av over I-95 NB & SB
FairProvidence County, Rhode Island · 0.6 MI S of Mass Line · Structure no. 000000000005600
- Built
- 1964
- 61 years old, rebuilt 2005
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 146 ft
- 2 main spans
- Daily traffic
- 6,100
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
Central Av over I-95 NB & SB is a steel stringer/multi-beam or girder carrying Central Av over I-95 NB & SB in Providence County, Rhode Island. It was built in 1964 and reconstructed in 2005, so it is 61 years old, older than the Rhode Island average of 54.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,100 vehicles a day, roughly 2% of them trucks, projected to reach 6,710 by 2041. The structure is 146 ft (44.6 m) long and 58 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Central Av over I-95 NB & SB built?
It was built in 1964, making it 61 years old in 2025. It was reconstructed in 2005.
What condition is Central Av over I-95 NB & SB in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Central Av over I-95 NB & SB carry?
About 6,100 vehicles per day (2021 count), of which roughly 2% are trucks.
How long is Central Av over I-95 NB & SB?
The structure is 146 ft (44.6 m) long with a longest span of 74 ft (22.5 m) and a deck 58 ft wide.
Who owns Central Av over I-95 NB & SB?
It is owned by the State Highway Agency.