Taunton Av Ramp over I-195 EB & WB
FairProvidence County, Rhode Island · 1.4 MI W of JCT Ri 114 · Structure no. 000000000004630
- Built
- 2005
- 20 years old
- Condition
- Fair
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 381 ft
- 3 main spans
- Daily traffic
- 15,000
- 2008 count
- Owner
- State
- State Highway Agency
About this bridge
Taunton Av Ramp over I-195 EB & WB is a steel continuous stringer/multi-beam or girder carrying Taunton Av Ramp over I-195 EB & WB in Providence County, Rhode Island. It was built in 2005, so it is 20 years old, younger than the Rhode Island average of 54.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15,000 vehicles a day, roughly 10% of them trucks, projected to reach 18,000 by 2036. The structure is 381 ft (116.1 m) long and 31 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Taunton Av Ramp over I-195 EB & WB built?
It was built in 2005, making it 20 years old in 2025.
What condition is Taunton Av Ramp over I-195 EB & WB in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does Taunton Av Ramp over I-195 EB & WB carry?
About 15,000 vehicles per day (2008 count), of which roughly 10% are trucks.
How long is Taunton Av Ramp over I-195 EB & WB?
The structure is 381 ft (116.1 m) long with a longest span of 176 ft (53.6 m) and a deck 31 ft wide.
Who owns Taunton Av Ramp over I-195 EB & WB?
It is owned by the State Highway Agency.