US Bridges

Off Pr 335 over Yauco River

Good

Yauco Municipio, Puerto Rico · _ · Structure no. 029591

Built
2011
14 years old
Condition
Good
inspected May 2023
Type
Girder and Floorbeam System
Steel
Length
100 ft
1 main span
Daily traffic
100
2011 count
Owner
City
City or Municipal Highway Agency

About this bridge

Off Pr 335 over Yauco River is a steel girder and floorbeam system carrying Off Pr 335 over Yauco River in Yauco Municipio, Puerto Rico. It was built in 2011, so it is 14 years old, younger than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 2% of them trucks, projected to reach 200 by 2020. The structure is 100 ft (30.5 m) long and 55 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesOff Pr 335
CrossesYauco River
Location_
Coordinates17.98696, -66.84056
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating54.8 US tons
Inventory rating32.7 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length100 ft (30.5 m)
Longest span96 ft (29.4 m)
Deck width55 ft (16.8 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deck32 ft (9.9 m)

Traffic and service

Average daily traffic100 (2011)
Projected traffic200 by 2020
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Off Pr 335 over Yauco River built?

It was built in 2011, making it 14 years old in 2025.

What condition is Off Pr 335 over Yauco River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Off Pr 335 over Yauco River carry?

About 100 vehicles per day (2011 count), of which roughly 2% are trucks.

How long is Off Pr 335 over Yauco River?

The structure is 100 ft (30.5 m) long with a longest span of 96 ft (29.4 m) and a deck 55 ft wide.

Who owns Off Pr 335 over Yauco River?

It is owned by the City or Municipal Highway Agency.