Off Pr 182 11.2 KM over Guayanes River
PoorPosted for loadYabucoa Municipio, Puerto Rico · 0.2 KM South of Pr 182 · Structure no. 025801
- Built
- 1988
- 37 years old
- Condition
- Poor
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 64 ft
- 2 main spans
- Daily traffic
- 2,000
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Off Pr 182 11.2 KM over Guayanes River is a steel stringer/multi-beam or girder carrying Off Pr 182 11.2 KM over Guayanes River in Yabucoa Municipio, Puerto Rico. It was built in 1988, so it is 37 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.
It carries about 2,000 vehicles a day, roughly 2% of them trucks, projected to reach 2,700 by 2025. The structure is 64 ft (19.4 m) long and 16 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Off Pr 182 11.2 KM over Guayanes River built?
It was built in 1988, making it 37 years old in 2025.
What condition is Off Pr 182 11.2 KM over Guayanes River in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in March 2024.
How much traffic does Off Pr 182 11.2 KM over Guayanes River carry?
About 2,000 vehicles per day (2017 count), of which roughly 2% are trucks.
How long is Off Pr 182 11.2 KM over Guayanes River?
The structure is 64 ft (19.4 m) long with a longest span of 29 ft (8.7 m) and a deck 16 ft wide.
Who owns Off Pr 182 11.2 KM over Guayanes River?
It is owned by the City or Municipal Highway Agency.