Pr 53 40.2 KM over Guayanes River
GoodYabucoa Municipio, Puerto Rico · 6 Kms. N.E. of Yabucoa. · Structure no. 025251
- Built
- 1997
- 28 years old
- Condition
- Good
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 8,317 ft
- 75 main spans
- Daily traffic
- 17,900
- 2017 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Pr 53 40.2 KM over Guayanes River is a prestressed concrete stringer/multi-beam or girder carrying Pr 53 40.2 KM over Guayanes River in Yabucoa Municipio, Puerto Rico. It was built in 1997, so it is 28 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 17,900 vehicles a day, roughly 5% of them trucks, projected to reach 23,600 by 2025. The structure is 8,317 ft (2,535 m) long and 61 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 53 40.2 KM over Guayanes River built?
It was built in 1997, making it 28 years old in 2025.
What condition is Pr 53 40.2 KM over Guayanes River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does Pr 53 40.2 KM over Guayanes River carry?
About 17,900 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 53 40.2 KM over Guayanes River?
The structure is 8,317 ft (2,535 m) long with a longest span of 112 ft (34.1 m) and a deck 61 ft wide.
Who owns Pr 53 40.2 KM over Guayanes River?
It is owned by the State Toll Authority.