Pr 902 11.5 KM over Limones River
FairPosted for loadYabucoa Municipio, Puerto Rico · 5 KM Northwest of Yabucoa · Structure no. 008531
- Built
- 1962
- 63 years old
- Condition
- Fair
- inspected January 2024
- Type
- Slab
- Concrete Continuous
- Length
- 99 ft
- 3 main spans
- Daily traffic
- 900
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 902 11.5 KM over Limones River is a concrete continuous slab carrying Pr 902 11.5 KM over Limones River in Yabucoa Municipio, Puerto Rico. It was built in 1962, so it is 63 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 900 vehicles a day, roughly 2% of them trucks, projected to reach 1,300 by 2025. The structure is 99 ft (30.1 m) long and 29 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 902 11.5 KM over Limones River built?
It was built in 1962, making it 63 years old in 2025.
What condition is Pr 902 11.5 KM over Limones River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Pr 902 11.5 KM over Limones River carry?
About 900 vehicles per day (2017 count), of which roughly 2% are trucks.
How long is Pr 902 11.5 KM over Limones River?
The structure is 99 ft (30.1 m) long with a longest span of 38 ft (11.6 m) and a deck 29 ft wide.
Who owns Pr 902 11.5 KM over Limones River?
It is owned by the State Highway Agency.