Pr 181 13.6 KM over Guayabota Creek
FairPosted for loadYabucoa Municipio, Puerto Rico · 1 KM S Int PR181 & Pr · Structure no. 004111
- Built
- 1940
- 85 years old
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 90 ft
- 1 main span
- Daily traffic
- 6,300
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 181 13.6 KM over Guayabota Creek is a steel stringer/multi-beam or girder carrying Pr 181 13.6 KM over Guayabota Creek in Yabucoa Municipio, Puerto Rico. It was built in 1940, so it is 85 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 6,300 vehicles a day, roughly 3% of them trucks, projected to reach 8,600 by 2025. The structure is 90 ft (27.3 m) long and 25 ft wide. If it were closed, the detour would be 21.1 mi (34 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 181 13.6 KM over Guayabota Creek built?
It was built in 1940, making it 85 years old in 2025.
What condition is Pr 181 13.6 KM over Guayabota Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Pr 181 13.6 KM over Guayabota Creek carry?
About 6,300 vehicles per day (2017 count), of which roughly 3% are trucks.
How long is Pr 181 13.6 KM over Guayabota Creek?
The structure is 90 ft (27.3 m) long with a longest span of 36 ft (10.9 m) and a deck 25 ft wide.
Who owns Pr 181 13.6 KM over Guayabota Creek?
It is owned by the State Highway Agency.