US Bridges

Pr 5561 KM 1.75 over Pr 150 KM 1.9

GoodClosed to traffic

Villalba Municipio, Puerto Rico · 1.5 KM South Villalba · Structure no. 027841

Built
2006
19 years old
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
124 ft
1 main span
Daily traffic
3,500
2017 count
Owner
City
City or Municipal Highway Agency

About this bridge

Pr 5561 KM 1.75 over Pr 150 KM 1.9 is a prestressed concrete stringer/multi-beam or girder carrying Pr 5561 KM 1.75 over Pr 150 KM 1.9 in Villalba Municipio, Puerto Rico. It was built in 2006, so it is 19 years old, younger than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: closed to all traffic.

It carries about 3,500 vehicles a day, roughly 4% of them trucks, projected to reach 5,000 by 2025. The structure is 124 ft (37.9 m) long and 62 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesPr 5561 KM 1.75
CrossesPr 150 KM 1.9
Location1.5 KM South Villalba
RouteState Highway 5561
Coordinates18.11987, -66.4947
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusClosed to all traffic
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating69.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length124 ft (37.9 m)
Longest span124 ft (37.9 m)
Deck width62 ft (18.8 m)
Roadway width59 ft (17.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,500 (2017)
Projected traffic5,000 by 2025
Trucks4%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pr 5561 KM 1.75 over Pr 150 KM 1.9 built?

It was built in 2006, making it 19 years old in 2025.

What condition is Pr 5561 KM 1.75 over Pr 150 KM 1.9 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Pr 5561 KM 1.75 over Pr 150 KM 1.9 carry?

About 3,500 vehicles per day (2017 count), of which roughly 4% are trucks.

How long is Pr 5561 KM 1.75 over Pr 150 KM 1.9?

The structure is 124 ft (37.9 m) long with a longest span of 124 ft (37.9 m) and a deck 62 ft wide.

Who owns Pr 5561 KM 1.75 over Pr 150 KM 1.9?

It is owned by the City or Municipal Highway Agency.