Pr 149 over Achiote Creek
FairPosted for loadVillalba Municipio, Puerto Rico · 1.5 KM North of Villalba · Structure no. 003121
- Built
- 1921
- 104 years old
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 71 ft
- 2 main spans
- Daily traffic
- 1,400
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 149 over Achiote Creek is a steel stringer/multi-beam or girder carrying Pr 149 over Achiote Creek in Villalba Municipio, Puerto Rico. It was built in 1921, so it is 104 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 1,400 vehicles a day, roughly 5% of them trucks, projected to reach 1,800 by 2025. The structure is 71 ft (21.6 m) long and 21 ft wide. If it were closed, the detour would be 4.3 mi (7 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 149 over Achiote Creek built?
It was built in 1921, making it 104 years old in 2025.
What condition is Pr 149 over Achiote Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does Pr 149 over Achiote Creek carry?
About 1,400 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 149 over Achiote Creek?
The structure is 71 ft (21.6 m) long with a longest span of 35 ft (10.8 m) and a deck 21 ft wide.
Who owns Pr 149 over Achiote Creek?
It is owned by the State Highway Agency.