US Bridges

PR-10 over Off PR-123 at Km. 52.0

Good

Utuado Municipio, Puerto Rico · 2.93 Kms. S.W. of Utado · Structure no. 029471

Built
2012
13 years old
Condition
Good
inspected November 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
217 ft
3 main spans
Daily traffic
7,600
2017 count
Owner
State
State Highway Agency

About this bridge

PR-10 over Off PR-123 at Km. 52.0 is a prestressed concrete stringer/multi-beam or girder carrying PR-10 over Off PR-123 at Km. 52.0 in Utuado Municipio, Puerto Rico. It was built in 2012, so it is 13 years old, younger than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,600 vehicles a day, roughly 5% of them trucks, projected to reach 9,800 by 2025. The structure is 217 ft (66.2 m) long and 55 ft wide.

CarriesPR-10
CrossesOff PR-123 at Km. 52.0
Location2.93 Kms. S.W. of Utado
RouteState Highway 10
Coordinates18.25079, -66.72361
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65 US tons
Inventory rating49.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length217 ft (66.2 m)
Longest span78 ft (23.7 m)
Deck width55 ft (16.9 m)
Roadway width53 ft (16.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,600 (2017)
Projected traffic9,800 by 2025
Trucks5%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was PR-10 over Off PR-123 at Km. 52.0 built?

It was built in 2012, making it 13 years old in 2025.

What condition is PR-10 over Off PR-123 at Km. 52.0 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does PR-10 over Off PR-123 at Km. 52.0 carry?

About 7,600 vehicles per day (2017 count), of which roughly 5% are trucks.

How long is PR-10 over Off PR-123 at Km. 52.0?

The structure is 217 ft (66.2 m) long with a longest span of 78 ft (23.7 m) and a deck 55 ft wide.

Who owns PR-10 over Off PR-123 at Km. 52.0?

It is owned by the State Highway Agency.