Off Pr 140 over Creek
FairPosted for loadUtuado Municipio, Puerto Rico · 6 Kms SE of Utuado · Structure no. 023301
- Built
- 1987
- 38 years old
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 85 ft
- 3 main spans
- Daily traffic
- 600
- 2010 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Off Pr 140 over Creek is a steel stringer/multi-beam or girder carrying Off Pr 140 over Creek in Utuado Municipio, Puerto Rico. It was built in 1987, so it is 38 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 600 vehicles a day, projected to reach 900 by 2025. The structure is 85 ft (26 m) long and 18 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Off Pr 140 over Creek built?
It was built in 1987, making it 38 years old in 2025.
What condition is Off Pr 140 over Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does Off Pr 140 over Creek carry?
About 600 vehicles per day (2010 count).
How long is Off Pr 140 over Creek?
The structure is 85 ft (26 m) long with a longest span of 28 ft (8.6 m) and a deck 18 ft wide.
Who owns Off Pr 140 over Creek?
It is owned by the City or Municipal Highway Agency.