US Bridges

Pr 22 over Creek

Fair

Toa Baja Municipio, Puerto Rico · 5 KM S E of Toa Baja · Structure no. 017581

Built
1981
44 years old
Condition
Fair
inspected May 2023
Type
Culvert
Concrete
Length
24 ft
2 main spans
Daily traffic
89,400
2017 count
Owner
Toll Authority
State Toll Authority

About this bridge

Pr 22 over Creek is a concrete culvert carrying Pr 22 over Creek in Toa Baja Municipio, Puerto Rico. It was built in 1981, so it is 44 years old, younger than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 89,400 vehicles a day, roughly 5% of them trucks, projected to reach 112,600 by 2025. The structure is 24 ft (7.3 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesPr 22
CrossesCreek
Location5 KM S E of Toa Baja
Coordinates18.41812, -66.24642
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating110.1 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length24 ft (7.3 m)
Longest span11 ft (3.5 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic89,400 (2017)
Projected traffic112,600 by 2025
Trucks5%
Lanes on structure9
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$66,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Pr 22 over Creek built?

It was built in 1981, making it 44 years old in 2025.

What condition is Pr 22 over Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does Pr 22 over Creek carry?

About 89,400 vehicles per day (2017 count), of which roughly 5% are trucks.

How long is Pr 22 over Creek?

The structure is 24 ft (7.3 m) long with a longest span of 11 ft (3.5 m).

Who owns Pr 22 over Creek?

It is owned by the State Toll Authority.