Pr 819 over Bucarabones River
FairPosted for loadToa Alta Municipio, Puerto Rico · 3 KM East of Toa Alta · Structure no. 012171
- Built
- 1970
- 55 years old
- Condition
- Fair
- inspected March 2023
- Type
- Slab
- Concrete Continuous
- Length
- 89 ft
- 3 main spans
- Daily traffic
- 10,700
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 819 over Bucarabones River is a concrete continuous slab carrying Pr 819 over Bucarabones River in Toa Alta Municipio, Puerto Rico. It was built in 1970, so it is 55 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 10,700 vehicles a day, roughly 5% of them trucks, projected to reach 13,900 by 2025. The structure is 89 ft (27.1 m) long and 22 ft wide. If it were closed, the detour would be 5.6 mi (9 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 819 over Bucarabones River built?
It was built in 1970, making it 55 years old in 2025.
What condition is Pr 819 over Bucarabones River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does Pr 819 over Bucarabones River carry?
About 10,700 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 819 over Bucarabones River?
The structure is 89 ft (27.1 m) long with a longest span of 31 ft (9.6 m) and a deck 22 ft wide.
Who owns Pr 819 over Bucarabones River?
It is owned by the State Highway Agency.