Pr 119 39.4 KM over Sonador River
FairPosted for loadSan Sebastian Municipio, Puerto Rico · 4.5 KM S of San Sebastian · Structure no. 002551
- Built
- 1921
- 104 years old
- Condition
- Fair
- inspected April 2024
- Type
- Tee Beam
- Concrete
- Length
- 33 ft
- 1 main span
- Daily traffic
- 4,800
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 119 39.4 KM over Sonador River is a concrete tee beam carrying Pr 119 39.4 KM over Sonador River in San Sebastian Municipio, Puerto Rico. It was built in 1921, so it is 104 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 4,800 vehicles a day, roughly 5% of them trucks, projected to reach 6,200 by 2025. The structure is 33 ft (10.1 m) long and 20 ft wide. If it were closed, the detour would be 5.6 mi (9 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 119 39.4 KM over Sonador River built?
It was built in 1921, making it 104 years old in 2025.
What condition is Pr 119 39.4 KM over Sonador River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Pr 119 39.4 KM over Sonador River carry?
About 4,800 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 119 39.4 KM over Sonador River?
The structure is 33 ft (10.1 m) long with a longest span of 33 ft (10.1 m) and a deck 20 ft wide.
Who owns Pr 119 39.4 KM over Sonador River?
It is owned by the State Highway Agency.