PR-18 over PR-21
GoodSan Juan Municipio, Puerto Rico · PR18 KM 4.2 · Structure no. 030941
- Built
- 2020
- 5 years old
- Condition
- Good
- inspected September 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 229 ft
- 2 main spans
- Daily traffic
- 239,000
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
PR-18 over PR-21 is a prestressed concrete box beam or girders - multiple carrying PR-18 over PR-21 in San Juan Municipio, Puerto Rico. It was built in 2020, so it is 5 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 239,000 vehicles a day, roughly 1% of them trucks, projected to reach 272,500 by 2025. The structure is 229 ft (69.7 m) long and 45 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was PR-18 over PR-21 built?
It was built in 2020, making it 5 years old in 2025.
What condition is PR-18 over PR-21 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does PR-18 over PR-21 carry?
About 239,000 vehicles per day (2017 count), of which roughly 1% are trucks.
How long is PR-18 over PR-21?
The structure is 229 ft (69.7 m) long with a longest span of 123 ft (37.4 m) and a deck 45 ft wide.
Who owns PR-18 over PR-21?
It is owned by the State Highway Agency.