US Bridges

Camino De Jesus over _

Good

San Juan Municipio, Puerto Rico · Luciano Vazquez Road · Structure no. 030821

Built
2018
7 years old
Condition
Good
inspected March 2023
Type
Culvert
Aluminum, Wrought Iron, or Cast Iron
Length
29 ft
1 main span
Daily traffic
1,500
2005 count
Owner
City
City or Municipal Highway Agency

About this bridge

Camino De Jesus over _ is a aluminum, wrought iron, or cast iron culvert carrying Camino De Jesus over _ in San Juan Municipio, Puerto Rico. It was built in 2018, so it is 7 years old, younger than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,500 vehicles a day, roughly 2% of them trucks, projected to reach 7,500 by 2025. The structure is 29 ft (8.8 m) long and 32 ft wide. If it were closed, the detour would be 62.1 mi (100 km).

CarriesCamino De Jesus
Crosses_
LocationLuciano Vazquez Road
RouteCity Street 0
Coordinates18.33836, -66.05909
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection4 PoorAdvanced section loss, deterioration, spalling or scour.
Culvert8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation*: *
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating—
Inventory rating—

Structure

Structure typeCulvert
MaterialAluminum, Wrought Iron, or Cast Iron
DeckNot applicable
Main spans1
Design loadUnknown
Structure length29 ft (8.8 m)
Longest span29 ft (8.8 m)
Deck width32 ft (9.8 m)
Roadway width30 ft (9.2 m)
Vertical clearance over deck13 ft (4 m)

Traffic and service

Average daily traffic1,500 (2005)
Projected traffic7,500 by 2025
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed62.1 mi (100 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Camino De Jesus over _ built?

It was built in 2018, making it 7 years old in 2025.

What condition is Camino De Jesus over _ in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Camino De Jesus over _ carry?

About 1,500 vehicles per day (2005 count), of which roughly 2% are trucks.

How long is Camino De Jesus over _?

The structure is 29 ft (8.8 m) long with a longest span of 29 ft (8.8 m) and a deck 32 ft wide.

Who owns Camino De Jesus over _?

It is owned by the City or Municipal Highway Agency.