US Bridges

Pr 181 67.5 KM over Pr 3 3.5 KM

Good

San Juan Municipio, Puerto Rico · 11.12 Km. S.E. of San Jua · Structure no. 028281

Built
2011
14 years old
Condition
Good
inspected February 2024
Type
Segmental Box Girder
Prestressed Concrete
Length
1,906 ft
12 main spans
Daily traffic
16,200
2017 count
Owner
State
State Highway Agency

About this bridge

Pr 181 67.5 KM over Pr 3 3.5 KM is a prestressed concrete segmental box girder carrying Pr 181 67.5 KM over Pr 3 3.5 KM in San Juan Municipio, Puerto Rico. It was built in 2011, so it is 14 years old, younger than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 16,200 vehicles a day, roughly 5% of them trucks, projected to reach 20,400 by 2025. The structure is 1,906 ft (580.9 m) long and 72 ft wide.

CarriesPr 181 67.5 KM
CrossesPr 3 3.5 KM
Location11.12 Km. S.E. of San Jua
RouteState Highway 181
Coordinates18.39499, -66.03129
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61.9 US tons
Inventory rating47.5 US tons

Structure

Structure typeSegmental Box Girder
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans12
Design loadHS 20 + Mod
Structure length1,906 ft (580.9 m)
Longest span166 ft (50.5 m)
Deck width72 ft (21.8 m)
Roadway width64 ft (19.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic16,200 (2017)
Projected traffic20,400 by 2025
Trucks5%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pr 181 67.5 KM over Pr 3 3.5 KM built?

It was built in 2011, making it 14 years old in 2025.

What condition is Pr 181 67.5 KM over Pr 3 3.5 KM in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Pr 181 67.5 KM over Pr 3 3.5 KM carry?

About 16,200 vehicles per day (2017 count), of which roughly 5% are trucks.

How long is Pr 181 67.5 KM over Pr 3 3.5 KM?

The structure is 1,906 ft (580.9 m) long with a longest span of 166 ft (50.5 m) and a deck 72 ft wide.

Who owns Pr 181 67.5 KM over Pr 3 3.5 KM?

It is owned by the State Highway Agency.