US Bridges

Ramp Pr 25 to Pr 1 over Pr 35

Good

San Juan Municipio, Puerto Rico · 9.1 KM SE of San Juan · Structure no. 026371

Built
2000
25 years old
Condition
Good
inspected February 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
125 ft
2 main spans
Daily traffic
4,988
2004 count
Owner
State
State Highway Agency

About this bridge

Ramp Pr 25 to Pr 1 over Pr 35 is a prestressed concrete box beam or girders - multiple carrying Ramp Pr 25 to Pr 1 over Pr 35 in San Juan Municipio, Puerto Rico. It was built in 2000, so it is 25 years old, younger than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,988 vehicles a day, roughly 4% of them trucks, projected to reach 6,000 by 2025. The structure is 125 ft (38.1 m) long and 33 ft wide.

CarriesRamp Pr 25 to Pr 1
CrossesPr 35
Location9.1 KM SE of San Juan
RouteCity Street 1
Coordinates18.43502, -66.06054
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating110.1 US tons
Inventory rating95.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length125 ft (38.1 m)
Longest span63 ft (19.2 m)
Deck width33 ft (10 m)
Roadway width29 ft (8.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,988 (2004)
Projected traffic6,000 by 2025
Trucks4%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ramp Pr 25 to Pr 1 over Pr 35 built?

It was built in 2000, making it 25 years old in 2025.

What condition is Ramp Pr 25 to Pr 1 over Pr 35 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does Ramp Pr 25 to Pr 1 over Pr 35 carry?

About 4,988 vehicles per day (2004 count), of which roughly 4% are trucks.

How long is Ramp Pr 25 to Pr 1 over Pr 35?

The structure is 125 ft (38.1 m) long with a longest span of 63 ft (19.2 m) and a deck 33 ft wide.

Who owns Ramp Pr 25 to Pr 1 over Pr 35?

It is owned by the State Highway Agency.