31 S.E. Street over Josefina Creek
FairSan Juan Municipio, Puerto Rico · Between 54 & 52 SE ST · Structure no. 021441
- Built
- 1964
- 61 years old
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete Continuous
- Length
- 32 ft
- 3 main spans
- Daily traffic
- 1,000
- 2002 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
31 S.E. Street over Josefina Creek is a concrete continuous stringer/multi-beam or girder carrying 31 S.E. Street over Josefina Creek in San Juan Municipio, Puerto Rico. It was built in 1964, so it is 61 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,000 vehicles a day, roughly 2% of them trucks, projected to reach 1,500 by 2020. The structure is 32 ft (9.8 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 31 S.E. Street over Josefina Creek built?
It was built in 1964, making it 61 years old in 2025.
What condition is 31 S.E. Street over Josefina Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does 31 S.E. Street over Josefina Creek carry?
About 1,000 vehicles per day (2002 count), of which roughly 2% are trucks.
How long is 31 S.E. Street over Josefina Creek?
The structure is 32 ft (9.8 m) long with a longest span of 10 ft (3 m) and a deck 41 ft wide.
Who owns 31 S.E. Street over Josefina Creek?
It is owned by the City or Municipal Highway Agency.