Andalcia ST 0.1 KM over Josefina Creek KM 0.1
FairSan Juan Municipio, Puerto Rico · Int 54 & Ottawa SE ST · Structure no. 021261
- Built
- 1950
- 75 years old
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 50 ft
- 3 main spans
- Daily traffic
- 8,700
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Andalcia ST 0.1 KM over Josefina Creek KM 0.1 is a concrete stringer/multi-beam or girder carrying Andalcia ST 0.1 KM over Josefina Creek KM 0.1 in San Juan Municipio, Puerto Rico. It was built in 1950, so it is 75 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,700 vehicles a day, roughly 2% of them trucks, projected to reach 12,500 by 2025. The structure is 50 ft (15.1 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Andalcia ST 0.1 KM over Josefina Creek KM 0.1 built?
It was built in 1950, making it 75 years old in 2025.
What condition is Andalcia ST 0.1 KM over Josefina Creek KM 0.1 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does Andalcia ST 0.1 KM over Josefina Creek KM 0.1 carry?
About 8,700 vehicles per day (2017 count), of which roughly 2% are trucks.
How long is Andalcia ST 0.1 KM over Josefina Creek KM 0.1?
The structure is 50 ft (15.1 m) long with a longest span of 19 ft (5.7 m) and a deck 43 ft wide.
Who owns Andalcia ST 0.1 KM over Josefina Creek KM 0.1?
It is owned by the City or Municipal Highway Agency.