Pr 52 Southbound over Local Road
FairSan Juan Municipio, Puerto Rico · 5 KM South of Rio Piedras · Structure no. 012612
- Built
- 1977
- 48 years old
- Condition
- Fair
- inspected January 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 103 ft
- 1 main span
- Daily traffic
- 65,266
- 2003 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Pr 52 Southbound over Local Road is a prestressed concrete stringer/multi-beam or girder carrying Pr 52 Southbound over Local Road in San Juan Municipio, Puerto Rico. It was built in 1977, so it is 48 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 65,266 vehicles a day, roughly 4% of them trucks, projected to reach 77,287 by 2020. The structure is 103 ft (31.3 m) long and 59 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 52 Southbound over Local Road built?
It was built in 1977, making it 48 years old in 2025.
What condition is Pr 52 Southbound over Local Road in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.
How much traffic does Pr 52 Southbound over Local Road carry?
About 65,266 vehicles per day (2003 count), of which roughly 4% are trucks.
How long is Pr 52 Southbound over Local Road?
The structure is 103 ft (31.3 m) long with a longest span of 99 ft (30.1 m) and a deck 59 ft wide.
Who owns Pr 52 Southbound over Local Road?
It is owned by the State Toll Authority.