Pr 18 2.1 KM over Piedras River
FairPosted for loadSan Juan Municipio, Puerto Rico · 0.3 KM N Int PR17 & P · Structure no. 010101
- Built
- 1967
- 58 years old, rebuilt 1982
- Condition
- Fair
- inspected December 2023
- Type
- Tee Beam
- Concrete Continuous
- Length
- 133 ft
- 3 main spans
- Daily traffic
- 261,000
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 18 2.1 KM over Piedras River is a concrete continuous tee beam carrying Pr 18 2.1 KM over Piedras River in San Juan Municipio, Puerto Rico. It was built in 1967 and reconstructed in 1982, so it is 58 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 261,000 vehicles a day, roughly 5% of them trucks, projected to reach 298,000 by 2025. The structure is 133 ft (40.5 m) long and 153 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 18 2.1 KM over Piedras River built?
It was built in 1967, making it 58 years old in 2025. It was reconstructed in 1982.
What condition is Pr 18 2.1 KM over Piedras River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does Pr 18 2.1 KM over Piedras River carry?
About 261,000 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 18 2.1 KM over Piedras River?
The structure is 133 ft (40.5 m) long with a longest span of 46 ft (14 m) and a deck 153 ft wide.
Who owns Pr 18 2.1 KM over Piedras River?
It is owned by the State Highway Agency.