Pr 114 10.1 KM over Guanajibo River
FairSan German Municipio, Puerto Rico · 6.5 KM N W of San German · Structure no. 019361
- Built
- 1989
- 36 years old
- Condition
- Fair
- inspected September 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 99 ft
- 2 main spans
- Daily traffic
- 12,700
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 114 10.1 KM over Guanajibo River is a prestressed concrete box beam or girders - multiple carrying Pr 114 10.1 KM over Guanajibo River in San German Municipio, Puerto Rico. It was built in 1989, so it is 36 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 12,700 vehicles a day, roughly 4% of them trucks, projected to reach 17,000 by 2025. The structure is 99 ft (30.3 m) long and 38 ft wide. If it were closed, the detour would be 4.3 mi (7 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 114 10.1 KM over Guanajibo River built?
It was built in 1989, making it 36 years old in 2025.
What condition is Pr 114 10.1 KM over Guanajibo River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Pr 114 10.1 KM over Guanajibo River carry?
About 12,700 vehicles per day (2017 count), of which roughly 4% are trucks.
How long is Pr 114 10.1 KM over Guanajibo River?
The structure is 99 ft (30.3 m) long with a longest span of 50 ft (15.2 m) and a deck 38 ft wide.
Who owns Pr 114 10.1 KM over Guanajibo River?
It is owned by the State Highway Agency.