Pr 348 12.4 KM over Los Vazquez Creek
FairPosted for loadSan German Municipio, Puerto Rico · 7 KM East of Hormigueros · Structure no. 013001
- Built
- 1950
- 75 years old
- Condition
- Fair
- inspected February 2023
- Type
- Slab
- Concrete
- Length
- 23 ft
- 1 main span
- Daily traffic
- 600
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 348 12.4 KM over Los Vazquez Creek is a concrete slab carrying Pr 348 12.4 KM over Los Vazquez Creek in San German Municipio, Puerto Rico. It was built in 1950, so it is 75 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 600 vehicles a day, roughly 3% of them trucks, projected to reach 900 by 2025. The structure is 23 ft (6.9 m) long and 20 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 348 12.4 KM over Los Vazquez Creek built?
It was built in 1950, making it 75 years old in 2025.
What condition is Pr 348 12.4 KM over Los Vazquez Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.
How much traffic does Pr 348 12.4 KM over Los Vazquez Creek carry?
About 600 vehicles per day (2017 count), of which roughly 3% are trucks.
How long is Pr 348 12.4 KM over Los Vazquez Creek?
The structure is 23 ft (6.9 m) long with a longest span of 20 ft (6 m) and a deck 20 ft wide.
Who owns Pr 348 12.4 KM over Los Vazquez Creek?
It is owned by the State Highway Agency.