US Bridges

Pr 3363 over Pr 2

Fair

San German Municipio, Puerto Rico · 5 KM S W of Sabana Grande · Structure no. 009631

Built
1972
53 years old
Condition
Fair
inspected February 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
151 ft
2 main spans
Daily traffic
100
2017 count
Owner
State
State Highway Agency

About this bridge

Pr 3363 over Pr 2 is a prestressed concrete stringer/multi-beam or girder carrying Pr 3363 over Pr 2 in San German Municipio, Puerto Rico. It was built in 1972, so it is 53 years old, older than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 100 vehicles a day, roughly 4% of them trucks, projected to reach 100 by 2025. The structure is 151 ft (46.1 m) long and 26 ft wide. If it were closed, the detour would be 8.7 mi (14 km).

CarriesPr 3363
CrossesPr 2
Location5 KM S W of Sabana Grande
RouteState Highway 3363
Coordinates18.08111, -66.99806
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating79.8 US tons
Inventory rating48.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length151 ft (46.1 m)
Longest span76 ft (23.1 m)
Deck width26 ft (7.8 m)
Roadway width23 ft (7.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2017)
Projected traffic100 by 2025
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed8.7 mi (14 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$3.6 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pr 3363 over Pr 2 built?

It was built in 1972, making it 53 years old in 2025.

What condition is Pr 3363 over Pr 2 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.

How much traffic does Pr 3363 over Pr 2 carry?

About 100 vehicles per day (2017 count), of which roughly 4% are trucks.

How long is Pr 3363 over Pr 2?

The structure is 151 ft (46.1 m) long with a longest span of 76 ft (23.1 m) and a deck 26 ft wide.

Who owns Pr 3363 over Pr 2?

It is owned by the State Highway Agency.