Off Pr 3 KM 153.20 over Unnamed Creek
PoorSalinas Municipio, Puerto Rico · NE PR3 & PR-706 · Structure no. 030151
- Built
- 1988
- 37 years old
- Condition
- Poor
- inspected September 2024
- Type
- Slab
- Concrete
- Length
- 26 ft
- 1 main span
- Daily traffic
- 14,500
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Off Pr 3 KM 153.20 over Unnamed Creek is a concrete slab carrying Off Pr 3 KM 153.20 over Unnamed Creek in Salinas Municipio, Puerto Rico. It was built in 1988, so it is 37 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 14,500 vehicles a day, roughly 4% of them trucks, projected to reach 17,400 by 2025. The structure is 26 ft (7.9 m) long and 27 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Off Pr 3 KM 153.20 over Unnamed Creek built?
It was built in 1988, making it 37 years old in 2025.
What condition is Off Pr 3 KM 153.20 over Unnamed Creek in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in September 2024.
How much traffic does Off Pr 3 KM 153.20 over Unnamed Creek carry?
About 14,500 vehicles per day (2017 count), of which roughly 4% are trucks.
How long is Off Pr 3 KM 153.20 over Unnamed Creek?
The structure is 26 ft (7.9 m) long with a longest span of 20 ft (6 m) and a deck 27 ft wide.
Who owns Off Pr 3 KM 153.20 over Unnamed Creek?
It is owned by the City or Municipal Highway Agency.